Snap Wrap Offshore Extended Version Structural Repair

Snap Wrap Offshore Extended Version Structural Repair

Middle East

Pipe Details:

14” heavy wall structural cross member.
8 metre repair length.

Repair Application:

Severe external corrosion (up to 80%) metal loss on structural member designed to hold riser support clamps.

Engineered heavy wall composite sleeve, manufactured in 600mm widths using bi-axial glass architecture

Extensive filler application and molding to rebuild pipe surface to original outer diameter and sleeves installed and cut to length in a brick wall fashion.

Once completed riser holding clamps reinstated over the repair area.

Pipe cleaned and showing severe external corrosion

Repair sleeves installed

Riser holding clamps reinstated onto repair and riser

Sealing of completed repair area prior to corrosion coating application

HAVE A QUESTION OR NEED MORE INFORMATION? GET IN TOUCH.



Clock Spring has offices around the world with our global headquarters in Houston, TX, USA.

Have a question or need more information? Give us a call or fill in the form, and one of our representatives will reach out to you soon.

North America (USA)
621 Lockhaven Drive
Houston, TX 77073
P: +1-281-590-8491
F: +1-281-590-9528
Eastern Europe
M. Konopnickiej Street
No 2a
Bydgoszcz, Poland
85-124
P: +48 601 707 946
England
4A The Causeway
Godmanchester, Cambridgeshire
England PE29 2HA, UK
P: +44-1480-414-703
F: +44-1480-414-705
Middle East
Addax Tower Level 44
Office No. 4409
Al Reem Island
Abu Dhabi, UAE
P: +971 2 447 4288
M: +971 5 66758217
Scotland
54 Victoria Road
Aberdeen, Scotland
AB11 6FJ
P: +44 7985 396313






Speak with an expert

Fields with * are required








Inquiry Reason:
Market Segment:
How Can We Help?*: