Contour Chemical Plant Mitre Bend Repair

Contour Chemical Plant Mitre Bend Repair

Western Europe

Pipe Details:

14” diameter bend
2 barg operating pressure
30C operating temperature
9.53 original wall thickness


Defect Details:

3.2 mm of wall thickness remaining.


Repair Application:

A repair was designed by the Clock Spring Technical Centre using ISO 24817. The pipe was cleaned using water and sand blasting.  15 layers of Clock Spring Contour were applied over the pipe.


Repair Time:

3 days on-site using Clock Spring Contour trained and approved technicians.

Area to be repaired after sand blasting.

First 4 layers installed and left to cure.

Completed repair

HAVE A QUESTION OR NEED MORE INFORMATION? GET IN TOUCH.



Clock Spring has offices around the world with our global headquarters in Houston, TX, USA.

Have a question or need more information? Give us a call or fill in the form, and one of our representatives will reach out to you soon.

North America (USA)
621 Lockhaven Drive
Houston, TX 77073
P: +1-281-590-8491
F: +1-281-590-9528
Eastern Europe
M. Konopnickiej Street
No 2a
Bydgoszcz, Poland
85-124
P: +48 601 707 946
England
4A The Causeway
Godmanchester, Cambridgeshire
England PE29 2HA, UK
P: +44-1480-414-703
F: +44-1480-414-705
Middle East
Addax Tower Level 44
Office No. 4409
Al Reem Island
Abu Dhabi, UAE
P: +971 2 447 4288
M: +971 5 66758217
Scotland
54 Victoria Road
Aberdeen, Scotland
AB11 6FJ
P: +44 7985 396313






Speak with an expert

Fields with * are required








Inquiry Reason:
Market Segment:
How Can We Help?*: