Clock Spring Offshore Topside (Tight Clearance)

Clock Spring Offshore Topside (Tight Clearance)

West Malaysia

Pipe Details:

8” diameter operating at 10 bars containing hydrocarbon at ambient temperature.


Defect Details:

The defect is external corrosion with wall loss of 40%. Tees are located both before and after the defect. A 3” pipe hangs above the repair section with a tight clearance of only 3 inches.


Repair Application:

Clock Spring reinforcement sleeve is used and applied using the hand spool technique to meet the tight clearance restriction.


Repair Time:

The repair took 45 minutes to complete.

8” pipe with corrosion close proximity to 3” line

Filler and adhesive applied

Coil applied and held in position whilst curing

Completed repair

HAVE A QUESTION OR NEED MORE INFORMATION? GET IN TOUCH.



Clock Spring has offices around the world with our global headquarters in Houston, TX, USA.

Have a question or need more information? Give us a call or fill in the form, and one of our representatives will reach out to you soon.

North America (USA)
621 Lockhaven Drive
Houston, TX 77073
P: +1-281-590-8491
F: +1-281-590-9528
Eastern Europe
M. Konopnickiej Street
No 2a
Bydgoszcz, Poland
85-124
P: +48 601 707 946
England
4A The Causeway
Godmanchester, Cambridgeshire
England PE29 2HA, UK
P: +44-1480-414-703
F: +44-1480-414-705
Middle East
Addax Tower Level 44
Office No. 4409
Al Reem Island
Abu Dhabi, UAE
P: +971 2 447 4288
M: +971 5 66758217
Scotland
54 Victoria Road
Aberdeen, Scotland
AB11 6FJ
P: +44 7985 396313






Speak with an expert

Fields with * are required








Inquiry Reason:
Market Segment:
How Can We Help?*: